Kaishan Kenya KK01 Geothermal Power Station Passes Full Tests

The KK01 geothermal power station (Kaishan Kenya 01) in the Menengai geothermal field completed its 30-day stability test and all third-party witnessed tests — a Kaishan Group reference in East Africa.

Kaishan high-pressure geothermal drilling equipment
Country / region
Kenya
Application
Geothermal power · Menengai geothermal field
Equipment
Kaishan Group geothermal power station (KK01) — group-level project reference
Site conditions
Menengai geothermal field, Rift Valley, Kenya; high-temperature geothermal steam

Project story

Kaishan Group built and owns the KK01 geothermal power station in Kenya's Menengai geothermal field — the first such station fully owned by the group.

In March 2026, the station completed its 30-day stability operation test plus all independent third-party witnessed tests, moving into commercial operation (COD).

The project demonstrates the group's end-to-end capability in geothermal development — from drilling and steam field work to power generation — in the East African market.

Outcomes

  • Completed 30-day stability run and all third-party witnessed tests, ready for commercial operation
  • Group-level reference for geothermal projects across East Africa's Rift Valley

Kaishan Official Project Reference: Kaishan official news (Mar 2026) — "KK01 geothermal station completes all tests"

Need equipment matched to a similar project?

Send us your site conditions and we will confirm the right configuration within 24 hours.

Request a Quote

More case studies